Timetable information

Open timetable information widget

Please enter at least 3 characters to start searching

Please enter at least 3 characters to start searching

Switch between arrival and departure
Date 1 day back

Enter a date in the format DD.MM.YYYY or use the arrow keys to navigate through the calender. Press enter to select a date.

Date 1 day forwards
Time earlier

Enter a time in the format hh:mm or use the up and down arrow keys to navigate through the suggestions. Press enter to select a suggestion.

Time later
Advanced information

Network maps

The photo shows two passengers reading the network map at a stop

We serve almost every corner of the city. Our network maps provide an overview of all tram, bus, hillside railway and ferry connections.

Engineering works network map (valid from June 2, 2025)

GuteNachtLinie network – roughly 1–4 a.m. (valid since March 3, 2025)

Preview Map

Whether you are on your way to work or setting off for a party, our GuteNachtLinie routes will take you safe and sound to your destination and back, deep into the night.

Fare tip: The NachtTicket is a particularly inexpensive offer for night owls. Travel as often as you like anywhere in the network between 6 p.m. and 6 a.m. This ticket is not valid on special forms of transport.

Engineering works network map for disabled people (valid from June 2, 2025)

Picture

As well as a network map with information on accessibility at DVB stops, we provide detailed information on how to use local public transport in Dresden. This information brochure has been specially developed for wheelchair users in cooperation with Landesarbeitsgemeinschaft Selbsthilfe Sachsen e.V.


Wir bewegen Dresden
OSZAR »